Start of main content

Work Package 5 - Methodology Report

The purpose of the second stage of the Future Power System Architecture Programme (FPSA2) was to deepen the analysis of requirements carried out in FPSA1 which reported in July 2016, understand barriers to implementation, and to consider innovative frameworks for delivering new functionality.

This report describes the approach to, and learning from, the agile and iterative project methodology used by FPSA2 to enable integration of project activity as an ongoing process, and synthesis of findings into an integrated whole. It also summarises the specific methods used within each Work Package. It provides a link between the main final report and the individual Work Package reports.