Innovations Award 2012, Energy - Insulating Cross-arm for transmission towers: Arago Technology Ltd

The Arago team's primary advancement was to develop an insulating cross-arm to retro-fit onto existing transmission towers. In this case, the insulating cross-arm allows electricity network operators to increase the operating current/voltage levels with a net upgrade of transmission capacity of up to 150%. Subsequent development has< shown the technology to be equally beneficial when applied to new lines as the cross-arm dra

Front cover of Energy Innovations Awards case study 2012

For more information and to read more, download the case study today.