Topic Title: GMW3172-2008 DV validation testing and HALT Topic Summary: accelerated reliability testing Created On: 16 January 2011 02:33 PM Status: Post and Reply |
Linear : Threading : Single : Branch |
Search Topic |
Topic Tools
|
|
|
|
|
has anyone attempted to perform highly accelerated life testing(HALT) in order to shorten the test timing while following the GMW3172-2008 standard please?
can for example power temperature cycle test described in GMW3172-2008, be shortened by a HALT test ? and will the results be equally acceptable? regards, Yi |
|
|
|
|