![]() |
IET | ![]() |
|
search :
help :
home
|
||
|
Latest News:
|
|
|


|
Topic Title: Help Completing EIC Cert Topic Summary: Created On: 20 November 2012 01:49 PM Status: Post and Reply |
Linear : Threading : Single : Branch |
Search Topic |
Topic Tools
|
|
|
|
|
Hi I have just changed to a computer software for my EIC Certificates and the layout is different to what i used to use......
I'm getting confused here...... Board Characteristics.. Overcurrent Protective Device for the Distribution Circuit BS-EN ________ Rating _______________ Nom Voltage _____ RCD BS-EN________No Poles______________Rating(MA) If My Scenario is..... 100A Main Supply Fuse 100A Main Switch 10Way Split Load Board with 2 RCDS What would i put in the blanks..... As I'm confused whether it is the main switch or the RCD's or Both?? Thanks Dan |
|
|
|
|
|
|
|
|
Sounds to me like your CU is connected directly to the origin of the installation, so you don't have a distribution circuit as such.
- Andy. |
|
|
|
|
|
|
|
|
Thanks for the reply....That would make sense....I never had this part on my old certificates...
|
|
|
|
|
|
IET
» Wiring and the regulations
»
Help Completing EIC Cert
|
Topic Tools |
FuseTalk Standard Edition v3.2 - © 1999-2013 FuseTalk Inc. All rights reserved.





Search Topic


