Topic Title: Large SWA to lift 2m up
Topic Summary: Whats the best way?
Created On: 01 May 2012 03:04 PM
Status: Post and Reply
Linear : Threading : Single : Branch
<< 1 2 Previous Last unread
Search Topic Search Topic
Topic Tools Topic Tools
View similar topics View similar topics
View topic in raw text format. Print this topic.
 02 May 2012 08:19 PM
User is offline View Users Profile Print this message



CBR

Posts: 14
Joined: 21 November 2010

Originally posted by: Fm

Contact fb taylors, cable monkeys will pull them in and be off site before the health and safety guy has finished his cup of tea


Love it haha
 02 May 2012 08:27 PM
User is offline View Users Profile Print this message


Avatar for Martynduerden.
Martynduerden

Posts: 3181
Joined: 13 July 2008

Pick it up boy, the H&S legislation is being relaxed

-------------------------
Regards

Martyn.

Only a mediocre person is always at their best



www.electrical contractors uk.com
 02 May 2012 08:40 PM
User is offline View Users Profile Print this message


Avatar for sparkingchip.
sparkingchip

Posts: 5296
Joined: 18 January 2003

Around 21 people should be able to pick up the cable at 40 Kg apiece, so best lift one section at a time.
 02 May 2012 08:47 PM
User is offline View Users Profile Print this message


Avatar for Martynduerden.
Martynduerden

Posts: 3181
Joined: 13 July 2008

Originally posted by: sparkingchip

Around 21 people should be able to pick up the cable at 40 Kg apiece, so best lift one section at a time.


Umm not sure about that Andy, a good few years ago up norf I had a job to install a busbar in a factory it was to be fed with 2 400mm 4core swa's good job it was the two drums turned up 1 at 160m and the other at 120m in length, the three of us set about installing them.

we quickly got tired but slowly got them both in.

-------------------------
Regards

Martyn.

Only a mediocre person is always at their best



www.electrical contractors uk.com
 03 May 2012 08:52 AM
User is offline View Users Profile Print this message



tattyinengland

Posts: 740
Joined: 23 November 2006

Thank you all for the replies, I'm sorry I've been too busy to get on the computer for a while, and will take some time today today to process the replies.
From a quick skim of the replies, the rollers look ideal, and the general plan is going to be for 4 of us over a week end to install these and one 50mm 4 core SWA.
I'm much more willing to DIY than sub it out as I have all the kit and have often enough dealt with the cables apon entry into the LV switch chamber and chiller, it's just the installation of big cables at height is a new one for me.
It is a good idea though to find out the cost of subbing it out (don't discount the business benefits before you've had a look at the cost)

Thanks agian for all the replies.
 09 July 2012 10:16 AM
User is offline View Users Profile Print this message



tattyinengland

Posts: 740
Joined: 23 November 2006

Hi All

An update:

This winch is worth it's hire cost, the main problem being the hooked end of the cable rope catches everything it goes past; ladder rack rungs and air duct work included.

http://www.speedyservices.com/...-110v/productoverview

4 Guys and a couple of cables jacks = job well done. 4 guys were not enough to hand pull this in though. It was fine when we had to pull 30m or so but as the cable length got to +/- 50m it became next to impossible to drag it at high level.

The rest of the job we've done often enough which is making off the ends and terminating, so all should be good.

Thanks for the help. I'll post some pictures if anyone is interested?

Note: Cable drum rollers are not recommended unless the cable drum is perfectly round; ours were warped and did not roll round well.
 09 July 2012 08:28 PM
User is offline View Users Profile Print this message


Avatar for sparkyaj.
sparkyaj

Posts: 39
Joined: 04 June 2012

why not just move the sub fuse :-) - we have hand pulled in 150mm 5 core over 100 mtrs. Two hulks on the end pulling and two equally spaced lads guiding it. easy :-)

Although I do prefer using my forklift when things get heavy.
 09 July 2012 08:29 PM
User is offline View Users Profile Print this message


Avatar for sparkyaj.
sparkyaj

Posts: 39
Joined: 04 June 2012

Another quick thought - can you pull it from the final end back to the lower end - that will make life easier too.
 09 July 2012 08:39 PM
User is offline View Users Profile Print this message



Fm

Posts: 391
Joined: 24 August 2011

Keep some spare empty 2 litre coke bottles to wrap around the hook, it stops it catching on the ladder rack in my experience.

Likewise a 500ml bottle on the end of a cobra helps push it through ducts easier.
 09 July 2012 10:15 PM
User is offline View Users Profile Print this message


Avatar for kj scott.
kj scott

Posts: 2050
Joined: 02 April 2006

Originally posted by: Fm

Contact fb taylors, cable monkeys will pull them in and be off site before the health and safety guy has finished his cup of tea


Would that be viable for a few 95mm 4core armoured cables?

-------------------------
http://www.niceic.biz
IET » Wiring and the regulations » Large SWA to lift 2m up

<< 1 2 Previous Last unread
Topic Tools Topic Tools
Statistics

See Also:



FuseTalk Standard Edition v3.2 - © 1999-2013 FuseTalk Inc. All rights reserved.