Topic Title: Hire Cables
Topic Summary: testing and inspection
Created On: 29 September 2017 10:59 AM
Status: Read Only
Linear : Threading : Single : Branch
 Hire Cables   - SJay720 - 29 September 2017 10:59 AM  
 Hire Cables   - davezawadi - 29 September 2017 01:04 PM  
Search Topic Search Topic
Topic Tools Topic Tools
View similar topics View similar topics
View topic in raw text format. Print this topic.
 29 September 2017 10:59 AM
User is offline View Users Profile Print this message



SJay720

Posts: 2
Joined: 08 September 2017

I work for a generator hire company, as well as the hire of generators we also hire out cables and distribution equipment,

the 120/240mm cables are all visually inspected prior to going to site and because of there nature should be tested by the installer as part of the installation prior to being signed off

however the smaller 125a - 63a - 32a 16a cables with c-form sockets is a different idea, should we be formally testing and inspecting them annually with a visual inspection prior to each hire, or should we conduct a full test and inspection prior to each hire, given that a temporary installation over 6kw needs to be formally inspected and tested prior to use